Str. Rezervelor, no. 46A, Dudu, Chiajna, Romania. SUNCENTER building, floor 2. | Connect with us: |

References

2019 –GERMANY – OFFSHORE

Supervising the installation and commissioning of SCADA and protection systems on Borwin Gamma platform. Checking the proper functionality of SICAM 230 and S7 PLCs, proposing new solutions for optimizing the monitoring of the process.


2019 – QATAR – continued

Rayyan Village project substations, Phase 7 project substations, Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, COM500, LON, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2019 – SWEDEN

Manufacturing protection cubicles in Bucharest. Engineering relays in HTSC office in Bucharest, relays which are part of the cubicles. Testing the functionality of the relays in the cubicle with our own simulator produced by HTSC. Preparing and organizing the FAT. Installation of primary equipment in the substation. Installation and commissioning of protection cubicles. Energizing the substation.


2019 – ALGERIA

Pierrelatte – Preparation of FAT. Preparing settings and commissioning of relays like MICOM P142, P545, P645 and REF615.


2019 – FRANCE

Oued El Abtar and Hassi’R’Mel substations – installation, commissioning and testing of Partial Discharge Monitoring systems produced by SIEMENS. Training of our engineers in SIEMENS UK.


2018 – STUPINA

SCADA investigation and application debugging regarding the problems appeared in the communication with MOXA devices. Debugging of command procedures in order to read the correct status of the device.


2018 – CONGO

INGA Hydro Power Plant – Engineering and commissioning the MODBUS communication between AC500 PLC and SIEMENS STEP7 WinCC SCADA system. Configuring all signals for auxiliary services and drainage pumps control: commands, digital inputs, digital outputs and analog values. Integration of a SIEMENS RTU, engineering and commissioning, in order to supervise the drainage pumps.


2018 – SWEDEN

Ingemaro substation – maintenance tests for seven REF543 relays with Rogovski Coil. Testing the relays without de-energizing the bays.


2018 – UNITED KINGDOM – continued

Rampion onshore substation – Functional check of protection panels. Interface between protection panels – GIS, AIS, Transformers etc. Protection tests (SIEMENS 6MD, 7SA, 7UT, ABB REx670, REx650, RET615). SCADA signal tests.


2018 – MALAWI

Consultancy services for supervising the installation and commissioning of SCADA systems in different substations. Checking the quality of materials and the installation works, reporting “non-conformities” in case of deviations, evaluating claims and changing proposals, checking the progress of works, proposing technical solutions and supervising their implementation, etc.


2018 – QATAR – continued

Rayyan Village project substations, Phase 7 project substations, Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, COM500, LON, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2018 – UAE

Supervising the installation and commissioning of SCADA and protection systems in Dubai for Borwin Gamma platform. Attending mechanical completion inspections for different systems which are part of the platform. Supervising the installation and commissioning of all electrical installations on the platform.


2018 – CONGO – continued

Karavia substation – Integration of a new bay in MicroSCADA and busbar protection (REB500). Engineering and testing MicroSCADA application (display design, signal list implementation, establishing communication with SIPROTEC5 relays, etc.). Engineering and testing REB500 busbar protection.


2018 – Sweden

Vastervik and Hammeren substations – installation and commissioning of protection relays. Tuggen substation – supervising the installation of voltage transformers. Commissioning of the same.

2017 – KUWAIT – continued

Rawdatain X and Rawdatain W substations 275/132/11 kV – Configuration, setting and testing of the control and protection systems and commissioning of the control and protection systems: ABB, SIEMENS, TAPCON, EBERLE and ALSTOM.


2017 – QATAR – continued

Rayyan Village project substations, Phase 7 project substations, Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, COM500, LON, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2017 – ROMANIA

Constanta North 400/110 kV substation – Engineering and commissioning ABB COM500 application for converting signals from LON protocol to IEC104.


2017 – UNITED KINGDOM

Rampion onshore substation – Functional check of protection panels. Interface between protection panels – GIS, AIS, Transformers etc. Protection tests (RED670, REC670, RET670, REB670, RET650, REC650, REB650, RET615). SCADA signal tests.


2017 – UNITED KINGDOM

Offshore platforms: Walney, Race Bank Z01 and Z02, etc. – Commissioning of protection relays and generating signals for SCADA system: GE and ABB relays.


2017 – GERMANY

Dorpen substation – Commissioning of protection relays: T435, T426, D301, D302, Mauell, WAGO, ZENON SCADA, etc.


2017 – CONGO

Karavia substation – Integration of a new bay in MicroSCADA and busbar protection (REB500). Engineering and testing MicroSCADA application(display design, signal list implementation, establishing communication with SIPROTEC5 relays, etc.). Engineering and testing REB500 busbar protection.

2016 – QATAR

Boulevard 1 substation – Testing and commissioning of MicroSCADA application and COM581 gateway. Defect list clearing, engineering the application to fulfill the new requirements from client.


2016 – QATAR

Dukhan project – Testing and commissioning of MicroSCADA application and COM500 gateways. Implementing new bays in MicroSCADA (designing new displays, implementing signals as per signal lists, engineering communication with SCHNEIDER relays, etc.). Implementing the same in a so called PMS system which was integrating 7 substations in one system.


2016 – QATAR – continued

Rayyan Village project substations, Phase 7 project substations, Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, COM500, LON, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2016 – QATAR

Umm Al Houl 400 kV substation – precommissioning jobs. Checking full wiring of GIS and protection cubicles. Testing functionality of different equipment.


2016 – KUWAIT

Rawdatain X and Rawdatain W substations 275/132/11 kV – Configuration, setting and testing of the control and protection systems and commissioning of the control and protection systems: ABB, SIEMENS, TAPCON, EBERLE and ALSTOM.


2016 – CONGO – continued

Karavia, Fungurume, Panda substations – Configuration, setting and testing RTU560 and MicroSCADA v9.3. Implementing and testing new requirements from clients. Engineering and testing ABB REC670 bay control units.


2016 – SWEDEN

ABB Test Field, FAT for two SVCs in Australia – Configuring and testing relay protections: SEL 487E, SIPROTEC 5, GE T60, Trench CPR-04.


2016 – SWEDEN

ABB Test Field, FAT for 1 SVC in USA – Configuring and testing relay protections: SEL 487E, SEL487B (Benson Lake)


2016 – SWEDEN

ABB Test Field, FAT for 1 SVC in USA – Configuring and testing relay protections: SEL 487E, SEL487B, SEL411L, SEL2411, GE B30, GE T60 (Dogtown Road).


2016 – SWEDEN

ABB Test Field, FAT for 1 SVC in USA – Configuring and testing relay protections: SEL 487E, SEL 351A, SEL 411L, GE T35 (Suncrest)


2016 – SWEDEN

ABB Test Field, FAT for 1 SVC in Canada – Configuring and testing relay protections: SEL 487E, SEL 487B, SEL 351A (Brushy Hill)


2016 – LITHUANIA – continued

Nordbalt Project – Testing and commissioning of primary equipment (current transformers, voltage transformers, disconnectors, breakers, earth switches, capacitors, surge arresters, bushings, mechanical adjustments, closing and opening times, etc.) and secondary circuits in Kllaipeda substation (world’s longest HVDC extruded underground and subsea cable system). Equipment installation supervision. Commissioning and testing: contact resistance, interlocks, transformer signal testing with the control system, checking of complete wiring of protection cubicles, equipment mounting, protection relays commissioning, site investigations and troubleshooting, remote end changes commissioning, defect list clearance.

2015 – CONGO

Karavia, Fungurume, Panda substations – Configuration, setting and testing RTU560 and MicroSCADA v9.3. Implementing and testing new requirements from clients. Engineering and testing ABB REC670 bay control units.


2015 – QATAR – continued

Rayyan Village project substations, Phase 7 project substations, Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, COM500, LON, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2015 – LITHUANIA

Nordbalt Project – Testing and commissioning of primary equipment (current transformers, voltage transformers, disconnectors, breakers, earth switches, capacitors, surge arresters, bushings, mechanical adjustments, closing and opening times, etc.) and secondary circuits in Kllaipeda substation (world’s longest HVDC extruded underground and subsea cable system). Equipment installation supervision. Commissioning and testing: contact resistance, interlocks, transformer signal testing with the control system, checking of complete wiring of protection cubicles, equipment mounting, protection relays commissioning, site investigations and troubleshooting, remote end changes commissioning, defect list clearance.


2015 – ZAMBIA – continued

330/33/11kV: Lumwana S/S, 330/33/11kV Kalumbila S/S, 330/33/11kV Kansanshi S/S,330/33/11kV, Lusaka West S/S Zambia – protection relays commissioning, ABB Switchgear commissioning, Control and Protection System testing (REL670, RED670, RET670, REJ525, 7SA522, 7SD523, P120, MBCI)


2015 – PAKISTAN – continued

Full commissioning of protection relays and ABB SCADA systems for 2 x 132/22 kV electrical substations deserving 2x50MW wind farm projects at Gharo, Thatta District / Pakistan (Fauji Foundation Wind Energy Limited – FWEL-I & FWEL-II) – ABB MicroSCADA v. 9.3. IEC61850 , IEC60870-5-101 Slave, IEC60870-5-104 Master / Slave, Modbus TCP/IP Communications , database & HMI configuration , signal testing, electrical supervision


2015 – SWEDEN

Umea – Stornorrfors Hydro Power Plant – Engineering, testing and commissioning of ABB REG670. Successful SAT 155 MVA hydrogenerator.


2015 – SWEDEN

Junsele – Degerforsen Hydro Power Plant and Substation – Engineering, testing and commissioning of ABB REG650, RET650, REL650. 2×35 MVA hydrogenerators and main output transformers. SCADA signals and IEC61850 simulation.


2015 – SWEDEN

Junsele – Hallby Hydro Power Plant and Substation – Engineering, testing and commissioning of ABB REG670, RET670. 80 MVA generator lockout logic change, IEC61850 signal list modification and testing.


2015 – SWEDEN

Sundsvall – Hydro Power Plant and Substation – Engineering, testing and commissioning of ABB REG650. Successful FAT.


2015 – KUWAIT

Rawdatain Transmission Substation – Engineering, commissioning and testing ABB REL670, RET670, SIPROTEC 4 7SAxx, MICOM P14NB. Factory hardware modifications and functional testing.

2014 – QATAR – continued

Rayyan Village project substations, Phase 7 project substations, Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, COM500, LON, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2014 – PAKISTAN

Full commissioning of protection relays and ABB SCADA systems for 2 x 132/22 kV electrical substations deserving 2x50MW wind farm projects at Gharo, Thatta District / Pakistan (Fauji Foundation Wind Energy Limited – FWEL-I & FWEL-II) – ABB MicroSCADA v. 9.3. IEC61850 , IEC60870-5-101 Slave, IEC60870-5-104 Master / Slave, Modbus TCP/IP Communications , database & HMI configuration , signal testing, electrical supervision


2014 – ZAMBIA

330/33/11kV: Lumwana S/S, 330/33/11kV Kalumbila S/S, 330/33/11kV Kansanshi S/S,330/33/11kV, Lusaka West S/S Zambia – protection relays commissioning, ABB Switchgear commissioning, Control and Protection System testing (REL670, RED670, RET670, REJ525, 7SA522, 7SD523, P120, MBCI)


2014 – KUWAIT – continued

Retesting all protection relays and bay functionalities together with the final client. Examination of all drawings and documentation. Preparing and wiring different modifications requested by the client. Participating on technical discussions with the client and proposing technical solutions. Onsite maintenance of protection and control relays in power transmission networks including: distance relays schemes fault locators and auto reclose relays, transformer, bus bar and feeder protections, transformer tap changing control, synchronizing control, event and fault recorders. During the general check program, in all 3 substations (Sulayibia 400/300/33 kV, Fintas 400/300/33 kV, Jabriya 400/300/33 kV), all protection relays (ABB RED670, ABB REL670, ABB RET670, ABB REJ525, ABB REB500, Siemens 7SD522, Siemens 7SA522, AREVA P120, AREVA P920, SOLKOR N) were retested. The program also included testing of alarms and measurements to control room and dispatch center, switchgear testing (CB timing, motor currents, interlocking). All tests were witnessed by the client. Besides retesting, modification works were done (alarms, interlocking logic, trip logic) as per client request.


2014 – USA – Mackinac

Commissioning and testing a 200 MW back-to-back light station to help control power flow enhance grid stability and allow for the integration of additional renewable energy sources. Troubleshooting and commissioning engineer for primary equipment and secondary circuits in HVDC power station Mackinac USA. Commissioning and testing equipment (disconnectors, breakers, earth switches): mechanical adjustments, closing and opening times, contact resistance, signals, interlocks checking with the control system, checking of complete wiring of the protection cubicles. Remedy of defects detected during checking of the secondary circuits, defect list clearance. Commissioning and testing primary equipment: CT, CVT, DOSCT, DVD, rogowski current transformers.


2014 – SWEDEN

Holleforsen Hydro Power Plant and Substation – Engineering, testing and commissioning of 1×60 MVA hydrogenerator and 1×110 MVA Autotransformer 231/10/10 kV protection relays.


2014 – SWEDEN

Brista Power Plant Substattion – Engineering, testing and commissioning of ABB, SIEMENS and SEL protection relays.


2014 – SWEDEN

Degerforsen Hydro Power Plant and Substation – Decommissioning, documentation and re-designing and re-engineering the new relays and panels. Full refurbishment of generator and transformer bay.


2014 – SWEDEN

Hallby Hydro Power Plant and Substation – ABB (REG670, RET670), 80 MVA generator lockout logic change, IEC61850 signal list modification and testing.


2014 – SWEDEN

Stornorrfors Hydro Power Plant – ABB (REG670), Engineering, testing and commissioning, successful SAT 155 MVA hydrogenerator.


2014 – SWEDEN

FAT for TUNAL, Bogota, Colombia, SVC-U, ABB (RET670, RET615). Engineering, testing and commissioning TCR and TSC protection panels.


2014 – COLUMBIA

TUNAL, Bogota, Colombia, SVC-U. Engineering, testing and commissioning TCR and TSC protection panels. Installation of cubicles on site. Supervising the electrical installation. Commissioning and testing the substation.

2013 – KUWAIT

Retesting all protection relays and bay functionalities together with the final client. Examination of all drawings and documentation. Preparing and wiring different modifications requested by the client. Participating on technical discussions with the client and proposing technical solutions. Onsite maintenance of protection and control relays in power transmission networks including: distance relays schemes fault locators and auto reclose relays, transformer, bus bar and feeder protections, transformer tap changing control, synchronizing control, event and fault recorders. During the general check program, in all 3 substations (Sulayibia 400/300/33 kV, Fintas 400/300/33 kV, Jabriya 400/300/33 kV), all protection relays (ABB RED670, ABB REL670, ABB RET670, ABB REJ525, ABB REB500, Siemens 7SD522, Siemens 7SA522, AREVA P120, AREVA P920, SOLKOR N) were retested. The program also included testing of alarms and measurements to control room and dispatch center, switchgear testing (CB timing, motor currents, interlocking). All tests were witnessed by the client. Besides retesting, modification works were done (alarms, interlocking logic, trip logic) as per client request.


2013 – QATAR – continued

Phase 7 project substations, Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, COM500, LON, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, , testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2013 – QATAR – continued

Rayyan Village project substations: ABB MicroSCADA, COM500, IEC61850, T104, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests. Commissioning of transformers, SERGI systems, transformer monitoring systems, ABB, ALSTOM, SIEMENS protection relays, Diesel generators, AC/DC cubicles, etc.


2013 – SWEDEN

Rabacken – Site Acceptance Test, commissioning of two line feeders (400 kV) and a transformer bay (400/130 kV): current transformer, voltage transformer, primary equipment, AC/DC cubicles commissioning, Diesel group connections, DC battery connections, functional tests, commissioning for ABB relays (REL670, REC670, REB670) and Siemens relays (7SA613, 7UT61), commisioning of the SCADA signaling.


2013 – SWEDEN

Grundfors Hydro Power Plant and Substation – Engineering, testing and commissioning of 2×60 MVA hydrogenerator and 2×200 MVA Autotransformer 400/132/12 kV protection relays.


2013 – SWEDEN

Vasteraas – Test Field – Ammara transmission substation extension 1/2 circuit breaker diameters and classic double busbar systems 400/132/11 kV – Engineering, testing and commissioning of ABB RET670, REB670, REL670, RED670, REC670, REL650, REC650, RET650, REF615, RET615, REB615, Siemens 7SD522, Siemens 7SA522, SEL, etc. Successfull FAT.

2017 – KUWAIT – continued

Rawdatain X and Rawdatain W substations 275/132/11 kV – Configuration, setting and testing of the control and protection systems and commissioning of the control and protection systems: ABB, SIEMENS, TAPCON, EBERLE and ALSTOM.


2017 – QATAR – continued

Rayyan Village project substations, Phase 7 project substations, Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, COM500, LON, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2017 – ROMANIA

Constanta North 400/110 kV substation – Engineering and commissioning ABB COM500 application for converting signals from LON protocol to IEC104.


2017 – UNITED KINGDOM

Rampion onshore substation – Functional check of protection panels. Interface between protection panels – GIS, AIS, Transformers etc. Protection tests (RED670, REC670, RET670, REB670, RET650, REC650, REB650, RET615). SCADA signal tests.


2017 – UNITED KINGDOM

Offshore platforms: Walney, Race Bank Z01 and Z02, etc. – Commissioning of protection relays and generating signals for SCADA system: GE and ABB relays.


2017 – GERMANY

Dorpen substation – Commissioning of protection relays: T435, T426, D301, D302, Mauell, WAGO, ZENON SCADA, etc.


2017 – CONGO

Karavia substation – Integration of a new bay in MicroSCADA and busbar protection (REB500). Engineering and testing MicroSCADA application(display design, signal list implementation, establishing communication with SIPROTEC5 relays, etc.). Engineering and testing REB500 busbar protection.

2011 – KUWAIT

Commissioning and precommissioning works in Sulaibiya Fintas and Jabiriya substations (400/300/33 kV). Examination of all drawings and documentation. Checking of complete wiring of the protection cubicles and commissioning of the protection cubicles, equipment mounting, etc. Site investigations and troubleshooting. Onsite maintenance and commissioning protection and control relays in power transmission networks including: distance relays schemes fault locators and auto reclose relays, transformer, bus bar and feeder protections, transformer tap changing control, synchronizing control, event and fault recorders.


2011 – QATAR – continued

Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, COM500, LON, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, , testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2011 – QATAR – continued

Phase 7 project substations – ANS, DRS, AWS – ABB MicroSCADA, COM581, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, , testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2011 – ROMANIA

Constanta North Substation – Integrating a new relay in MicroSCADA system. Configuring the REx670 relay in order to communicate on LON with the old control system. Configuring the GPS synchronization of the newly installed relay. Implementing, engineering and testing all signals for the newly installed relay. Preparing the documentation for the operations made in the old system.


2011 – SWEDEN

Vasteraas – Test Field – Preparing the FAT for Novorossiysk project in Ukraine. Engineering and testing the protection relays, preparing the final tests.


2011 – FINLAND

Commissioning works for different primary equipments in Finnbole HVDC substation: DC disconnectors, DC earthswitches, AC circuit breakers, AC disconnectors, AC earth switches, valves. Commissioning of the converter transformers. Fault tracing external cabling (device to l/face cubicle). Testing and simulating signals for the control system for all kind of equipments from the substation.

2010 – QATAR – continued

Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, LON, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, , testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2010 – QATAR – continued

Phase 7 project substations – ANS, DRS, AWS – ABB MicroSCADA, COM581, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, , testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.

2009 – QATAR – continued

Phase 6 project substations – Installation and commissioning of MicroSCADA v8.4.4 (SYS500) ABB control systems in phase VI substations. Remedy of defects detected during checking of secondary circuits. Installation of GPS devices. Commissioning and testing voltage regulators type REGSYS (EBERLE). Commissioning, engineering and testing REF542plus relays. Checking the wiring of the cubicles and generating signals to MicroSCADA from protection cubicles, auxiliary services and local control cubicles.


2009 – QATAR – continued

Phase 7 project substations – ANS, DRS, AWS – ABB MicroSCADA, COM581, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, , testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.

2008 – UAE

Al Nadha substation – Sharja – Designing, engineering, implementing and commissioning RTU560 and MicroSCADA in 132/66/11 kV substation. Helping the engineering team in Mannheim with the design works. Installing and configuring all hardware equipment related to MicroSCADA system: industrial computers, alarm and hardcopy printers, RTU560, Ethernet switches, etc. Full configuration of REF542plus relays for 66 kV and 11 kV. Implementing the interlocking logic, synchronization, etc. Testing it with the client. Preparing and handing over the necessary documentation.


2008 – QATAR

Phase 6 project substations – Defect clearance for SCADA systems: ABB MicroSCADA, COM581, LON, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, , testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.


2008 – QATAR

Phase 7 project substations – ANS, DRS, AWS – ABB MicroSCADA, COM581, IEC61850, T104, T101, MODBUS, ABB relays, SIEMENS relays, EBERLE relays, ALSTOM relays. Configuration and full commissioning of ABB MicroSCADA software (Protection and Control Integrated System), System installing, network communication – Fiber Optics Dual Ring, SCADA communication through 61850 protocol, HMI design and development, testing of commands and signals from circuit breakers, disconnectors and earthing switches, , testing and correcting the wiring in power supply cubicles, configuring the database according to the customer requests.

2007 – Algeria – continued

Installation and commissioning of MicroSCADA v8.4.3 (SYS500 and COM500) ABB control system in project GARA13 in Algeria. Worked in all phases of the project, from pilot installation, unit testing, problem determination, configuration investigation, configuration


2007 – Italy

Vado Ligure – Installation and commissioning of MicroSCADA ABB Control System. Unit testing, problem determination, configuration investigation, configuration changes, code investigation, code fix, installation supervision, etc.


2007 – Spain

Ferrol – Supervising the installation of REF542 plus relays on a ship. Engineering the relays, testing the relays and energizing.


2007 – Libya – continued

Testing and commissioning of ALSTOM protection relays and primary equipment (MERLIN GERIN). Defect clearance of whole 400/220 kV substation.

2006 – Algeria – continued

Installation and commissioning of MicroSCADA v8.4.3 (SYS500 and COM500) ABB control system in project GARA13 in Algeria. Worked in all phases of the project, from pilot installation, unit testing, problem determination, configuration investigation, configuration


2006 – Libya

Testing and commissioning of ALSTOM protection relays and primary equipment (MERLIN GERIN). Defect clearance of whole 400/220 kV substation.


2006 – Morocco

Testing and commissioning of ALSTOM protection relays and primary equipment. Defect clearance of whole 400/220 kV substation.


2006 – Ethiopia

Testing and commissioning of ALSTOM protection relays and primary equipment.

2005 – Algeria

Installation and commissioning of MicroSCADA v8.4.3 (SYS500 and COM500) ABB control system in project GARA13 in Algeria. Worked in all phases of the project, from pilot installation, unit testing, problem determination, configuration investigation, configuration